Arlington 2014: Part 6: Additional Details

Feb 08, 2014 on PBS at 8:00 PM

Summary

The new kitchen windows are inspected. Cast iron waste pipes are installed with a traditional lead and oakum joint. Outside -- trim is replicated and new siding is installed.

Previous episode

Arlington 2014: Part 5: Getting to Level
Season 35 Episode 13

Feb 01, 2014

Next episode

Arlington 2014: Part 7: Arlington Heights
Season 35 Episode 15

Feb 15, 2014