West Roxbury: Outdoor Oasis

Feb 24, 2022 on PBS at 8:00 PM

Summary

At the house, out front we get to know the contractor while Ipe is being installed on the porch ceiling. Out back, a brick patio is laid. Inside, a dual fuel HVAC system is installed and ducts ran. At the Dracut Centre School, corbels are restored.

Previous episode

West Roxbury: Drain Pipe Puzzle
Season 43 Episode 19

Feb 17, 2022

Next episode

West Roxbury: Exploring Flooring
Season 43 Episode 21

Mar 17, 2022