Cambridge | Things Are Coming Together

Jan 26, 2006 on PBS at 8:00 PM

Summary

With only a week left on the project, master carpenter Norm Abram finds general contractor Tom Silva at work on the dramatic 3-story stair. With the teak treads and bronze balustrade finally in, Tom can work on installing the teak handrail. Audio/vis... (more)ual specialist Dan Chadwick shows host Kevin O'Connor how he's concealing a 61" plasma TV in the living room, and adding acoustical panels to enhance the sound in the room. Designer Todd Tsiang shows Kevin the modern fireplace mantle, tile, plumbing fixtures, and the fully decorated master suite. Tom reveals the private roof deck off the master bedroom as a new modular steel railing system is installed. Landscape contractor Roger Cook visits a 500-acre sod farm in Rhode Island to see how sod is grown and harvested. In the wet bar, tile contractor Joe Ferrante shows Norm a "bubbly" glass tile being installed on the backsplash.

Previous episode

Cambridge | Modern Conveniences in a Modern Home
Season 27 Episode 16

Jan 19, 2006

Next episode

Cambridge | A Red Box Becomes a Show House
Season 27 Episode 18

Feb 02, 2006