The Watertown House - 13

Dec 19, 1998 on PBS at 8:00 PM

Summary

Exterior painting by Steve Kiernan and crew is underway out back, as is the erection of a white cedar combination fence and trellis along the driveway. In the kitchen, Fred Morgan explains to us the ancient process of terrazzo flooring, with a modern... (more) twist: instead of concrete, epoxy is used. Drywaller Mike Couillard shows us a tiler backing board, that unlike cementitous board, can be worked with regular drywall tools, as well as 56"" wide drywall sheets that eliminate a seam when used in high-ceiled rooms such as ours. In the basement, Bill Clayton takes us through the perimeter drain and sump system his company has installed to deal with the flooding the house suffers during heavy rains. Roger Cook and crew unload trees and shrubs from a local nursery and begin sitting them around the yard. Finally, our host gets a lesson in granite work as Lenny Belliveau completes the foundation's stone veneer.

Previous episode

The Watertown House - 12
Season 20 Episode 12

Dec 12, 1998

Next episode

The Watertown House - 14
Season 20 Episode 14

Dec 26, 1998